top of page

COAL SEAM GAS PROJECTS

revamp
macs_1_orig.png

Client:
Location:
Year:
Project Summary:

Project Value:
AGM Responsibilities:

AGM Contract Value:
Contract Basis:

AGM Wellhead Technologies
Queensland, Australia
2015
The project involved the installation of metering and control skids integrated into a CSG Wellhead using new technology.
A$1.0M
AGM were responsible for concept, feed, detailed design, procurement and fabrication of unit on accelerated schedule.
A$0.3M
Lump Sum

Anchor 1
trf-skids.png

Client:
Location:
Year:
Project Summary:

Project Value:
AGM Responsibilities:

AGM Contract Value:
Contract Basis:

Origin Energy
Queensland, Australia
2014
The project involved installation of large water transfer infrastructure to manage water in CSG field
A$4.0M
AGM were responsible for detailed engineering and project closeout following dismissal of previous engineering contractor.
A$0.3M
Target Cost

Anchor 2
booster-pump_orig.png

Client:
Location:
Year:
Project Summary:

Project Value:
AGM Responsibilities:

AGM Contract Value:
Contract Basis:

Origin Energy
Queensland, Australia
2015
The project involved the installation of water pipeline booster pump servicing irrigation network.
A$1.5M
AGM were responsible for concept, feed, detailed design, procurement and fabrication of unit on accelerated schedule.
A$0.3M
Target Cost

Anchor 3
msu_orig.png

Client:
Location:
Year:
Project Summary:

Project Value:
AGM Responsibilities:

AGM Contract Value:
Contract Basis:

Origin Energy
Queensland, Australia
2016
The project involved the design of generic pumping skid to be integrated in existing CSG wellsite design.
A$1.6M
AGM were responsible for concept, feed and detailed design.
A$0.4M
Lump Sum

Anchor 4
sepump.png

Client:
Location:
Year:
Project Summary:

Project Value:
AGM Responsibilities:

AGM Contract Value:
Contract Basis:

Origin Energy
Queensland, Australia
2015
The project involved the design of generic pumping skid to be integrated in existing CSG wellsite design. 
A$2.0M
AGM were responsible for concept, feed and detailed design.  AGM were also used by client for QA during procurement activities.
A$0.15M
Lump Sum

Anchor 5
cp project range well surface_edited.jpg

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

 

 

 

 

 

 

 

 

AGM Contract Value:

Central Petroleum

Surat Basin, QLD

2021

Project Range Appraisal Well Surface Facilities

$10M

Management of completion of key engineering documents such as:

  • Basis of Design, P&IDs, etc.

  • Management of procurement packages until delivery of vendor equipment (including documentation)

  • Management of detailed design activities between engineering and construction providers: Piping Design, Instrument / Electrical Design, Constructor to ensure design remains aligned with design intent and complies with mandatory codes & standards.

  • Coordination of project stakeholder activities within central organisation: HAZOP, 3D Model Review, Pre-Startup Safety Review, etc.

  • Assistance with preparation of training manuals and commissioning procedures

  • Assistance with technical support to site constructor

 

$60K

CP - Range Project Field Development Plan.png

Client:

 

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

 

 

 

 

AGM Contract Value:

Central Petroleum

Surat Basin, QLD

2021

Range Project Field Development Plan

$500M

Support the delivery of the initial Field Development Plan (FDP) for the Range Project. Key deliverables were:  

  • Surface Facilities Basis of Design for Concept Select

  • Scope of Work for Concept Select

  • Input to FDP

  • Pre-Concept Select Key Decisions Report

$54K

Anchor 6
helen origin final.png

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

 

 

 

 

 

 

 

 

 

 

 

 

AGM Contract Value:

Origin Energy

Brisbane Central Control Room (BCCR)

2020

APLNG Alarm Management - Process Engineering Secondment

$500M (OPEX)

Provide process engineering input and support to the Alarm Management program with a focus on ongoing reduction of standing alarms to improve Operator workload. Deliverables included:

  • Coordinating updates to the PSS alarm database                                         

  • Managing alarm system changes via the MOC process including technical risk assessment facilitation

  • Validating alarm priorities, Operator actions and true consequence of an alarm.        

  • Updating critical documentation such as and alarm and trip registers and safe operating envelopes                                               

  • Documenting safety critical alarms for all operated assets within Integrated Gas pertinent to preventing Major Accident Events                     

  • Communicating information about safety critical alarms to Panel Operators and other stakeholders

  • Developing technical instruction for Panel Operators on the use of Fast/Tools maintenance mode functionality to be used for planned shutdowns on Phase 1 GPFs

$122K

Anchor 7
Checking the Temperature

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

 

 

 

 

 

 


 

AGM Contract Value:

Origin Energy

Surat Basin, QLD

2021

APLNG Cable Cooling Project

  • Site inspection to verify location of existing equipment and quantities required (for example fibre lengths). From previous experience, minor variations between trains are expected.

  • Generating site-specific engineering and project documentation for installation of DTSX temperature monitoring system and blower skid to air cool HV cables. Each train will have a dedicated DTSX unit installed in the train switchroom.

  • Development and installation of the site-specific software workpack configuration for the DTSX units.

  • Procurement, installation and testing of the DTSX hardware.

 

$44K

Anchor 8
origin helen 2.jpg

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

 

 

 

 

 

 

 

 

 

AGM Contract Value:

Origin Energy

Surat Basin, QLD

2020

Beam Pump Artificial Lift for Brownfield and Greenfield Wellsites

$25M

  • Process design of the overall beam pump project, including basis of design, P&ID, hazardous area drawings, control philosophy, alarm and trip schedule and cause and effect diagram

  • Coordinating HAZOP study, including preparation works and close-out of process engineering actions

  • Coordinating Operations readiness activities including beam pump online training for Field and Panel Operators

  • Coordinating operational and commissioning critical spares assessment, including preparation works with vendor

  • Providing process discipline input into the mechanical and electrical packages

$41K

Anchor 9
Anchor 10
Business Consultation

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

 

 

 

 

 

 

AGM Contract Value:

Shell QGC

Surat Basin, Queensland

2021

Shell QGC - Condamine Power Station Operating Strategy

$2.5M

  • Frame opportunity and facilitate opportunity kick-off meeting with internal stakeholders and external engineering contractor.

  • Develop a Project Premises Document (PPD)

  • Acted in owners team front end representative role to integrate specialist technical front end engineering contrator and owners team commerical group.

  • Document Assess Stage Feasibility Report (FR) with Type 1 cost estimation, risk assessments, business case and schedule.

$50K

Gas Pressure Gauge

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

AGM Contract Value:

Shell QGC

Surat Basin, Queensland

2021

HPU Low Fuel Gas Pressure Trip Reduction

$16.7M

Improve wellsite availability /reliability (2000+ HPUs) by installing improved wellsite hydraulic power unit (HPU) fuel gas conditioning.

$70K

Anchor 11
QGC STEEL CASING.jpg

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

 

AGM Contract Value:

Shell QGC

Surat

2021

STS Well Casing Corrosion

$16.7M

Mitigate licence to operate risks and economic future by developing scope to prevent or slow external casing corrosion from occurring/worsening above a slumped Top of Cement. 

$70K

Anchor 12
Westside.JPG

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

 

 

 

 

 

AGM Contract Value:

Westside Corporation

Bowen Basin, Queensland

2022

Front End Engineering for Multi-Well Pad Design

$1 M

  • Minimises bottom hole pressure especially for low flowing wells

  • Simplify the site installation to reduce capital costs and complexity

  • Remove open water tanks from field

  • Rationalise flow measurement to meet requirements of regulatory and reservoir monitoring stakeholders

  • Reduce the requirement for local inspections of the well facility

  • Improve the reliability and inspection requirements of the wellhead surface facilities

$180K

Anchor 13
ARROW STAND.png

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

 

 

 

 

 

 

 

AGM Contract Value:

Arrow Energy

Surat Basin, Queensland

2021

Off Plot Engineering Standardisation SGP Project - Snr Project Engineer

$10B

  • Assist in updating the Engineering Design Management Plan

  • Close out of HAZOP Actions

  • Management of 3rd party engineering

  • Generate a Standard Design Document Library

  • Revision to Standard HPV Design including consultation with equipment Vendors, initiating the MOC process, conducting trial of new equipment options

  • Assess extent of modification required to existing standard equipment packages for pending increase to produced water gathering networks

  • Deliver design scope for a major revision to the Standard Multi Well Pad design

$297K

Anchor 14
Anchor 15
ARROW SIMPL.jpg

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

AGM Contract Value:

Arrow Energy

Queensland, Australia

2021Jordan

Off Plot Engineering Simplification SGP Project

$10B

  • Reducing the time, cost and FTE resources required to progress from receipt of reservoir forecasts to the completion of IFC deliverables in the well online process.

  • Achieving good alignment, engagement and ownership of change initiatives implemented with key stakeholder groups.

  • Reducing the number of engineering deliverables required and lowering the overall cost of engineering contractor services. 

$95K

QGC ETHLYENE.png

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

AGM Contract Value:

Shell QGC

Curtis Island, Gladstone

2021

Ethylene Reverse Flow

$3M

Eliminate DEM-2 Low temperature piping embrittlement risk by replacing / rerouting 4 sections of 20” to ensure self draining.

$87K

Anchor 16
bottom of page