COAL SEAM GAS PROJECTS
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Contract Basis:
AGM Wellhead Technologies
Queensland, Australia
2015
The project involved the installation of metering and control skids integrated into a CSG Wellhead using new technology.
A$1.0M
AGM were responsible for concept, feed, detailed design, procurement and fabrication of unit on accelerated schedule.
A$0.3M
Lump Sum
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Contract Basis:
Origin Energy
Queensland, Australia
2014
The project involved installation of large water transfer infrastructure to manage water in CSG field
A$4.0M
AGM were responsible for detailed engineering and project closeout following dismissal of previous engineering contractor.
A$0.3M
Target Cost
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Contract Basis:
Origin Energy
Queensland, Australia
2015
The project involved the installation of water pipeline booster pump servicing irrigation network.
A$1.5M
AGM were responsible for concept, feed, detailed design, procurement and fabrication of unit on accelerated schedule.
A$0.3M
Target Cost
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Contract Basis:
Origin Energy
Queensland, Australia
2016
The project involved the design of generic pumping skid to be integrated in existing CSG wellsite design.
A$1.6M
AGM were responsible for concept, feed and detailed design.
A$0.4M
Lump Sum
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Contract Basis:
Origin Energy
Queensland, Australia
2015
The project involved the design of generic pumping skid to be integrated in existing CSG wellsite design.
A$2.0M
AGM were responsible for concept, feed and detailed design. AGM were also used by client for QA during procurement activities.
A$0.15M
Lump Sum
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Central Petroleum
Surat Basin, QLD
2021
Project Range Appraisal Well Surface Facilities
$10M
Management of completion of key engineering documents such as:
-
Basis of Design, P&IDs, etc.
-
Management of procurement packages until delivery of vendor equipment (including documentation)
-
Management of detailed design activities between engineering and construction providers: Piping Design, Instrument / Electrical Design, Constructor to ensure design remains aligned with design intent and complies with mandatory codes & standards.
-
Coordination of project stakeholder activities within central organisation: HAZOP, 3D Model Review, Pre-Startup Safety Review, etc.
-
Assistance with preparation of training manuals and commissioning procedures
-
Assistance with technical support to site constructor
$60K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Central Petroleum
Surat Basin, QLD
2021
Range Project Field Development Plan
$500M
Support the delivery of the initial Field Development Plan (FDP) for the Range Project. Key deliverables were:
-
Surface Facilities Basis of Design for Concept Select
-
Scope of Work for Concept Select
-
Input to FDP
-
Pre-Concept Select Key Decisions Report
$54K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Origin Energy
Brisbane Central Control Room (BCCR)
2020
APLNG Alarm Management - Process Engineering Secondment
$500M (OPEX)
Provide process engineering input and support to the Alarm Management program with a focus on ongoing reduction of standing alarms to improve Operator workload. Deliverables included:
-
Coordinating updates to the PSS alarm database
-
Managing alarm system changes via the MOC process including technical risk assessment facilitation
-
Validating alarm priorities, Operator actions and true consequence of an alarm.
-
Updating critical documentation such as and alarm and trip registers and safe operating envelopes
-
Documenting safety critical alarms for all operated assets within Integrated Gas pertinent to preventing Major Accident Events
-
Communicating information about safety critical alarms to Panel Operators and other stakeholders
-
Developing technical instruction for Panel Operators on the use of Fast/Tools maintenance mode functionality to be used for planned shutdowns on Phase 1 GPFs
$122K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Origin Energy
Surat Basin, QLD
2021
APLNG Cable Cooling Project
-
Site inspection to verify location of existing equipment and quantities required (for example fibre lengths). From previous experience, minor variations between trains are expected.
-
Generating site-specific engineering and project documentation for installation of DTSX temperature monitoring system and blower skid to air cool HV cables. Each train will have a dedicated DTSX unit installed in the train switchroom.
-
Development and installation of the site-specific software workpack configuration for the DTSX units.
-
Procurement, installation and testing of the DTSX hardware.
$44K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Origin Energy
Surat Basin, QLD
2020
Beam Pump Artificial Lift for Brownfield and Greenfield Wellsites
$25M
-
Process design of the overall beam pump project, including basis of design, P&ID, hazardous area drawings, control philosophy, alarm and trip schedule and cause and effect diagram
-
Coordinating HAZOP study, including preparation works and close-out of process engineering actions
-
Coordinating Operations readiness activities including beam pump online training for Field and Panel Operators
-
Coordinating operational and commissioning critical spares assessment, including preparation works with vendor
-
Providing process discipline input into the mechanical and electrical packages
$41K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Shell QGC
Surat Basin, Queensland
2021
Shell QGC - Condamine Power Station Operating Strategy
$2.5M
-
Frame opportunity and facilitate opportunity kick-off meeting with internal stakeholders and external engineering contractor.
-
Develop a Project Premises Document (PPD)
-
Acted in owners team front end representative role to integrate specialist technical front end engineering contrator and owners team commerical group.
-
Document Assess Stage Feasibility Report (FR) with Type 1 cost estimation, risk assessments, business case and schedule.
$50K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Shell QGC
Surat Basin, Queensland
2021
HPU Low Fuel Gas Pressure Trip Reduction
$16.7M
Improve wellsite availability /reliability (2000+ HPUs) by installing improved wellsite hydraulic power unit (HPU) fuel gas conditioning.
$70K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Shell QGC
Surat
2021
STS Well Casing Corrosion
$16.7M
Mitigate licence to operate risks and economic future by developing scope to prevent or slow external casing corrosion from occurring/worsening above a slumped Top of Cement.
$70K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Westside Corporation
Bowen Basin, Queensland
2022
Front End Engineering for Multi-Well Pad Design
$1 M
-
Minimises bottom hole pressure especially for low flowing wells
-
Simplify the site installation to reduce capital costs and complexity
-
Remove open water tanks from field
-
Rationalise flow measurement to meet requirements of regulatory and reservoir monitoring stakeholders
-
Reduce the requirement for local inspections of the well facility
-
Improve the reliability and inspection requirements of the wellhead surface facilities
$180K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Arrow Energy
Surat Basin, Queensland
2021
Off Plot Engineering Standardisation SGP Project - Snr Project Engineer
$10B
-
Assist in updating the Engineering Design Management Plan
-
Close out of HAZOP Actions
-
Management of 3rd party engineering
-
Generate a Standard Design Document Library
-
Revision to Standard HPV Design including consultation with equipment Vendors, initiating the MOC process, conducting trial of new equipment options
-
Assess extent of modification required to existing standard equipment packages for pending increase to produced water gathering networks
-
Deliver design scope for a major revision to the Standard Multi Well Pad design
$297K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Arrow Energy
Queensland, Australia
2021Jordan
Off Plot Engineering Simplification SGP Project
$10B
-
Reducing the time, cost and FTE resources required to progress from receipt of reservoir forecasts to the completion of IFC deliverables in the well online process.
-
Achieving good alignment, engagement and ownership of change initiatives implemented with key stakeholder groups.
-
Reducing the number of engineering deliverables required and lowering the overall cost of engineering contractor services.
$95K