OIL REFINING PROJECTS
Viva Energy
Queensland, Australia
2016
The project involved revamping of crude unit to increase throughput by 40% and increase availability from 91 to 98%.
A$30.0M
AGM were responsible for the development of the conceptual design and business case for the project.
A$1.0M
Ineos
Grangemouth, Scotland
2005
Project redesign and revamp of unit following major unit fire and investigation.
A$300M
AGM were responsible for conceptual design and process design, commissioning lead as part of integrated design team.
A$1.0M
Transpacific
Queensland, Australia
2016
The project involved the design and supply of a heat exchanger skid which is used in equipment to clean industrial petroleum tanks.
A$0.3M
AGM were responsible for concept, feed, detailed design, procurement and fabrication of unit on accelerated schedule.
A$0.13M
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Kvaerner
Queensland, Australia
2000
Project involved major modification to refinery including installation of vacuum unit, hydrocracker unit and major revamps to existing processing units.
A$500M
AGM were responsible for process design of deep cut vacuum unit, crude unit revamp and flare systems. Supported other design, construction and commissioning teams.
A$0.5M
BP
Queensland, Australia
2006
The project involved development to install CCR Reforming Unit at BP Refinery.
A$300M
AGM were responsible for conceptual design of project on behalf of BP Refinery.
A$0.3M
BP
Queensland, Australia
2008
This project involved the revamp of a naphtha hydrotreater to increase throughput and availability of unit.
A$1.5B
AGM were responsible for concept design and then on secondment the owners process engineering.
A$0.5M
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Caltex
Queensland, Australia
2020
Diesel Max Project - Vac Flash 19034
Prepare Phase II deliverables and participate in key project reviews for installation of a vacuum flash distillation column to maximise middle distillates (diesel and jet) while reducing gasoline and LPG production is aligned with the refinery’s strategy to align production with forecast local petroleum product demands.
$55K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Viva Energy
Geelong, Victoria
2021
RCU and Amine Regenerator Unit PHA
Identify potential process safety risks that are not adequately mitigated for the nominated process areas, and to confirm that adequate management systems are in place to ensure ongoing risk mitigation.
$173K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Viva Energy
Geelong, Victoria
2020
Gasoline Masterplan Scope and Cost Estimating Services
-
Collation of Scope / Basis of Estimate /
-
On Line Meeting with Viva to Agree Basis of Estimate
-
Preparation of Estimate Including Uncertainty Assumptions
-
Presentation of Cost Estimate to Viva / Agreement of Uncertainties
-
Issue of Cost Estimate
$79K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Viva Energy
Geelong, Victoria
2021
Propylene Study
-
Frame the problem under consideration
-
Provide a list of processing opportunities (commercial / acquisition options are outside of scope).
-
Provide an “Assess” style technical and commercial comparison assessment of the opportunities.
-
Recommend a preferred method (s) to be developed further if appropriate.
$70K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Viva Energy
Geelong, Victoria
2018
Operations Support Services
-
Provide Training Courses to 3rd Parties (Viva)Commissioning
-
Training and involvement with Workplace Victoria
-
Panel Software Operating Manuals
-
Operator Competency Assessment Procedures
$69K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Ampol
Queensland, Australia
2021
Strategic Opportunity Framing Analysis
Summary of the business environment, problems requiring consideration & competitive advantages of the Lytton asset. For the highest ranked opportunities, develop preliminary block diagrams and descriptions which can be used for further project development.
$60K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Ampol
Queensland, Australia
2021
Operator Induction Training Services
Preparation of a training program focussed on upskilling “new hire” operators1 with a variety of background skills and experience.
-
Program Goals, Strategies and Objectives.
-
Minimum Competency Requirements
-
Competency and Training Roadmap for operating personnel
-
Program Boundaries
-
Training Methodology
-
Content of Training / Topics Covered
-
Schedule and Resource Requirements
$150K
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
Viva Energy
Geelong, Victoria
2019-2022
Unit Operating Window Preparation
Preparation of Unit Operating Window documents that review and enhance the detail relating to safe working limits and support the establishment of monitoring tools to enable surveillance of deviations from safe working limits.
$200k
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
BP
Queensland, Australia
2006
The project involved the installation of multi stage compressors. This served to recover Hydrogen from a reforming unit for use in a hydrocracking unit.
A$15M
AGM were responsible for concept design development on behalf of BP Refinery.
A$0.3M
Client:
Location:
Year:
Project Summary:
Project Value:
AGM Responsibilities:
AGM Contract Value:
BP
Queensland, Australia
2003
Project involved development of technology and installation of propylene saturation unit.
A$15M
AGM were responsible for process design activities. Winner of innovation award within BP.
A$0.3M